0905-E02 Dump
0905-E02 (en)
- 
                        Location – town/settlement Iginniarfik 
- 
                        Purpose Technical supply plants and other infrastructure 
- 
                        Specific use Technical supply plants 
- 
                        Use The area is to be used for technical purposes in the shape of waste management and can be used until a new sub-area south of the settlement has been developed and taken into use. 
- 
                        Current conditions The area covers an area of some 0.2 ha 
- 
                        Building provisions New buildings are to have a maximum height of eight metres 
- 
                        Remaining available space No special provisions 
- 
                        Traffic service and utilities From the area, access is to be provided to the other areas and functions in the settlement by means of the existing system of wheel tracks and paths 
- 
                        Listed, protected and preservation-worthy features No special provisions 
- 
                        Regulated zones The area is located under the obstacle limitation surface at the heliport (overflight area and transition surface). In the overflight area, buildings and other facilities cannot be higher than level 59.3 metres. Under the transition surface, the maximum ridge height is variable and depends on the distance to overflight area 
- 
                        Special provisions No special provisions 
 
                         
                        