1000-B19 Tupilak Island northwest

1000-B19 (en)

loading image
Loading map...
static-map
  • Location – town/settlement

    Aasiaat

  • Purpose

    Areas for industry and ports

  • Specific use

    Industry areas

  • Use

    The area is to be used for activities within office, contractors, industry, warehouses, skilled trade, workshop, production and transport, as well as terminal functions and similar port facilities. The offshore area may be used for anchoring and mooring. Furthermore, the area can be used for storage (not landfill site, dump etc.).

  • Current conditions

    The area covers an area of some 20 ha

  • Building provisions

    Prior to constructing new buildings, a complete plan is to be prepared for the entire area, which determines the type, scope and location of buildings as well as detailed provisions for the area’s development

  • Remaining available space

    The area has 100,000 m² of available space, depending on the final layout of the buildings. Once the abovementioned building potential has been utilised, the area is considered fully developed without any available space in the area.

  • Traffic service and utilities

    Within the area, only roads and other facilities that ensure the execution of the town plan’s projects are to be established

  • Listed, protected and preservation-worthy features

    No special provisions

  • Regulated zones

    Regulated zones exist around the airport in the shape of obstacle limitation surfaces that consist of partly a horizontal surface and a conical surface, partly approach and take-off surfaces in continuation of the runway. The area is located under the airport’s obstacle limitation surface, and is covered by the horizontal surface, where buildings and other facilities cannot be established higher than level 61.0 metres and roads no higher than level 56.0 metres. The area is located under the airport’s obstacle limitation surface, and is covered by the conical surface, where the maximum ridge level of buildings and facilities is variable, having a positive slope away from the outer limit of the horizontal surface.

  • Special provisions

    The necessary water areas may be filled in. The filling work is to result in a horizontal area, and be carried out according to an overall plan to be agreed on during detailed planning