1000-B19 Tupilak Island northwest
1000-B19 (en)
-
Location – town/settlement
Aasiaat
-
Purpose
Areas for industry and ports
-
Specific use
Industry areas
-
Use
The area is to be used for activities within office, contractors, industry, warehouses, skilled trade, workshop, production and transport, as well as terminal functions and similar port facilities. The offshore area may be used for anchoring and mooring. Furthermore, the area can be used for storage (not landfill site, dump etc.).
-
Current conditions
The area covers an area of some 20 ha
-
Building provisions
Prior to constructing new buildings, a complete plan is to be prepared for the entire area, which determines the type, scope and location of buildings as well as detailed provisions for the area’s development
-
Remaining available space
The area has 100,000 m² of available space, depending on the final layout of the buildings. Once the abovementioned building potential has been utilised, the area is considered fully developed without any available space in the area.
-
Traffic service and utilities
Within the area, only roads and other facilities that ensure the execution of the town plan’s projects are to be established
-
Listed, protected and preservation-worthy features
No special provisions
-
Regulated zones
Regulated zones exist around the airport in the shape of obstacle limitation surfaces that consist of partly a horizontal surface and a conical surface, partly approach and take-off surfaces in continuation of the runway. The area is located under the airport’s obstacle limitation surface, and is covered by the horizontal surface, where buildings and other facilities cannot be established higher than level 61.0 metres and roads no higher than level 56.0 metres. The area is located under the airport’s obstacle limitation surface, and is covered by the conical surface, where the maximum ridge level of buildings and facilities is variable, having a positive slope away from the outer limit of the horizontal surface.
-
Special provisions
The necessary water areas may be filled in. The filling work is to result in a horizontal area, and be carried out according to an overall plan to be agreed on during detailed planning