  • Location – town/settlement

    Attu

  • Purpose

    Areas for industry and ports

  • Specific use

    Industry areas

  • Use

    The area is to be used for activities within office, contractors, industry, warehouses, skilled trade, workshop, production and transport as well as port purposes involving dock and pier facilities, terminal functions and similar port facilities. The offshore area may be used for anchoring and mooring as well as helistop

  • Current conditions

    The area covers an area of some 3 ha

  • Building provisions

    New buildings are to have a maximum height of 12 metres

  • Remaining available space

    The area is fully developed without any available space

  • Traffic service and utilities

    From the area, access is to be provided to the other areas and functions in the settlement by means of the existing system of wheel tracks and paths

  • Listed, protected and preservation-worthy features

    No special provisions

  • Regulated zones

    The area is covered by the tank facility’s safety zone. The safety zone has a radius of 20 metres from the outer limit of the tank facility. This part of the area cannot be developed or in any other way be used contrary to the safety zone provisions. The area is located under the obstacle limitation surface at the heliport (overflight area and transition surface), where the maximum rigde height of buildings and facilities varies with a positive slope away from the start and landing area.

  • Special provisions

    Area allotments are to ensure that necessary measures be taken to prevent environmental impacts on the surroundings